Older


Index


Newer


Reflections

With this I thought all the welding was done, in six months the welder would be back.


More Welding

December 3, 2012

For quite some time we knew we needed to get back and fix some rust issues that were discovered while removing paint. The lower portion of both fenders need about a 3x4 patch and the spot on the top of the fender from a previous fix, the fender was replaced long before I got the car and the replacement originally had a fender top turn signal.

With those done work moved to the roof where some pin holes needed to be filled, between the welding and grinding the couple holes turned to 6 or so.


Older


Index


Newer


Older


Index


Newer